[yocto] Yocto Project Status WW25’18

Jolley, Stephen K stephen.k.jolley at intel.com
Mon Jun 18 07:57:56 PDT 2018


Current Dev Position: YP 2.6 M1 is in QA, accepting patches for YP 2.6 M2.

Next Deadline: YP 2.6 M1 release is targeted for June 22, 2018 (See update)


SWAT Team Rotation:

·         SWAT lead is currently: Armin

·         SWAT team rotation: Armin -> Maxin on June 22, 2018

·         SWAT team rotation: Maxin -> Ross on June 29, 2018

·         https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


Key Status/Updates:

·         2.4.3 was released

·         2.6 M1 was built and passed to QA.

·         2.3.4 and 2.2.4 are also both going through the QA process

·         gcc 8.1 was merged into master, thanks to everyone involved for the testing and fixes, I know some of the patches had some back and forth but believe we ended up with the right fixes.

·         Good news on the autobuilder front, we believe we now have enough feature equivalence between the old buildbot code and the new buildbot code to be able to switch all the infrastructure over to the new codebase. This marks the point where we get out of “catch up” mode and can start enhancing the functionality.

·         With M1 built, we believe we’ve merged a good portion of the patch backlog and been able to give feedback about a number of patches which were in an indeterminate state. We’ve tried hard to ensure patches are getting feedback, if anything has been missed, please let us know.


Planned Releases for YP 2.6:

·         YP 2.6 M1 Build Target is in QA.

·         YP 2.6 M1 Release Target is June 22, 2018

·         YP 2.6 M2 Build Target is July 16, 2018

·         YP 2.6 M2 Release Target is July 27, 2018

·         YP 2.6 M3 Build Target is Aug. 27, 2018

·         YP 2.6 M3 Release Target is Sept. 7, 2018

·         YP 2.6 M4 Build Target is Oct. 1, 2018

·         YP 2.6 M4 Release Target is Oct. 26, 2018


Planned upcoming dot releases:

·         YP 2.3.4 (Pyro) rc1 is built and in QA see https://wiki.yoctoproject.org/wiki/2.3_QA_Status it is at 92% complete.

·         YP 2.2.4 (Morty) rc1 is built and in QA see https://wiki.yoctoproject.org/wiki/2.2_QA_Status it is at 24% complete.

·         YP 2.5.1 (Sumo) will be targeted after YP 2.6 M2 is done.

·         YP 2.4.4 (Rocko) will be targeted after YP 2.6 M4 is done.


Tracking Metrics:

·         WDD 2568 (last week 2551) (https://wiki.yoctoproject.org/charts/combo.html)

·         Poky Patch Metrics

o    Total patches found: 1651 (last week 1597)

o    Percentage of patches in the Pending State: 765(46%) [last week 741 (47%)]


Key Status Links for YP:

https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.6_Status

https://wiki.yoctoproject.org/wiki/Yocto_2.6_Schedule

https://wiki.yoctoproject.org/wiki/Yocto_2.6_Features


The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status


[If anyone has suggestions for other information you’d like to see on this weekly status update, let us know!]

Thanks,

Stephen K. Jolley
Yocto Project Project Manager
INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124
•    Cell:                (208) 244-4460
• Email:                             stephen.k.jolley at intel.com

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.yoctoproject.org/pipermail/yocto/attachments/20180618/c97646eb/attachment-0001.html>


More information about the yocto mailing list