[yocto] FW: Agenda: Yocto Technical Team (Tuesday, June 07, 2011 8:00 AM-9:00 AM (UTC-08:00) Pacific Time )

Liu, Song song.liu at intel.com
Fri Jun 3 14:47:19 PDT 2011


Tuesday, June 07, 2011, 08:00 AM US Pacific Time
916-356-2663, 8-356-2663, Bridge: 94, Passcode: 9320476
Speed dial for iPhone: inteldialer://94,9320476 | Learn more<http://it.intel.com/products/handhelds/speeddial.htm>

Agenda:
*       Review Yocto 1.1 M1 Release Criteria - 10 min (Julie)
o       See details at:  https://wiki.yoctoproject.org/wiki/Yocto_Project_v1.1_Release_Criteria
*       Discuss M1 1.1 M1 Release Status, go/no-go vote - 10 min (Julie)
*       Review progress on M2 P1 items (see below) with incomplete designs - 30 min (Song)
*       Opens - 10 min

Feature Name    Description     Priority        Commit  Status  Owner   Design Signoff  Due     Comments / Bugzilla Links
Error handling in bitbake (Design)      Performance improvement (gather input from community on use cases)      1       Yes     Accept  Saul (Scott G)          M2,Sprint A     M2, Sprint A, (Scott to talk with Richard about the design of this item and then come back with update)
multi-lib complete      multi-lib support for 32-bit & 64-bit and capable of being installed at the same time fully complete    1       Yes     Accept  Richard (Qing/Ke)               M2, Sprint D    M2, Sprint D
Image Creator polish    polish and refine Image Creator - See https://wiki.yoctoproject.org/wiki/BitBake/GUI/PostOneOh for details      1               Accept  Josh            M2, Sprint D    M2, Sprint D, Jessica/Josh will work on these items
kernel bloat - development      target = boot a minimal image in < 8M - development complete    1               Accept  Darren          M2, Sprint D    M2, Sprint D
LayerTooling - Dependency handling      Dependency handling     1               M2, Sprint C    Paul            M2, Sprint C    M2 Sprint C, dependent on Sprint C item (LayerTooling), check next Tuesday
LayerTooling - layer merging tool       Tool to merge (flatten) several layers into one 1               M2, Sprint C    Paul            M2, Sprint C    M2, Sprint C, under review (Richard)
LayerTooling - remote layer tool        Consider integrating Jeremy Puhlman's remote layers patch       1               M2, Sprint C    Ke/Paul         M2, Sprint C    Jeremy is working on this, M2, Sprint C
Package config option enhancement - Plan        Plan our approach to package config option enhancement  2               M2, Design      Richard                 M2, Design
multi-lib infrastructure        multi-lib support for 32-bit & 64-bit and capable of being installed at the same time - infrastructure in place (multilib toolchain changes, configuration changes)     1       Yes     M2, Sprint A    Richard(Qing/Ke)                M2, Sprint B    M2, Sprint A, Sprint B
multi-lib RPM   RPM support for multilib added  1               M2, Sprint B    Richard (Qing)          M2, Sprint B    M2, Sprint B, too large, dependent on other features, Mark owns the architecture, leave for discussion with PRC team
LayerTooling - output info enhancement  1) Show a parse error if a bbappend matches no existing bb. 2) Update banner info to show layers being used and revisions/branches for each one if available    1       Yes     M2, Sprint B    Dexuan          M2, Sprint B    M2, Sprint B, Richard will look at the design again for these(LayerTooling), need discussion with PRC team
Layer Tooling - Architecture    Implement Layer Tooling changes 1       Yes     Accept  Richard (Paul/Daoxien will help)        n/a     M2, Sprint A    M2 Sprint A, still dependent on Jeremy
Optimize support for Intel hardware features    We need to understand and track each important Intel hardware feature and how it should be optimally supported in the Intel BSPS. Items that immediately come to mind are power, video, and performance counter settings, etc.  1               on-going        Tom/Darren              M2, Sprint A    M2, Sprint A, Tom/Darren will work together on the design (possibly break up this item), target: ww24.1
kernel bloat - analysis (Design)        target = boot a minimal image in < 8M - analysis complete       1       Yes     Accept  Darren          M2, Sprint A    M2, Sprint A, need to have specifics and design
LayerTooling - combo layer tool Tool to manage combination repos (e.g. the poky repo)   1       Yes     70%     Ke              M2, Sprint A    M2, Sprint A
Changes for Image Creator - phase 3     Phase 3:  package format job done + image output type job done  1               Accept  Joshua                  M2, Sprint B, needs to work Joshua and rearrange
Changes for Image Creator - phase 4     Phase 4: complete plug-in       1               Accept  Jessica                 M2, Sprint D, need reschedule


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.yoctoproject.org/pipermail/yocto/attachments/20110603/53cd45bb/attachment.html>


More information about the yocto mailing list