[poky] update status of M2 sprint tasks

Saul Wold sgw at linux.intel.com
Mon Dec 13 11:03:23 PST 2010


On 12/13/2010 08:31 AM, Mark Hatle wrote:
> On 12/13/10 5:53 AM, Tian, Kevin wrote:
>> Hi, owners,
>>
>> Since M2 code frozen happened last week and now M2 test has been started, could owners
>> of each M2 sprint tasks update the latest status on the wiki?
>>
>> https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule
>>
>> As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has
>> not been done (WIP or on track), could you either move it into M3 or fill an updated date
>> when current one is past?
>>
>> --M2SB--
>>
>> "Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark)
>
> I have the work done and tested.  Is it too late to submit this?
>

Mark, go ahead and submit it, so that we can have it available, and can 
make the call, there is clearly going to be a rebuild of M2 due to the 
kernel failures, but I am not sure that I want to bring in more than 
targeted changes at this point.

Remember we are in the stabilize window, which means targeted bug fixes.

Sau!

> (There are no code changes, just recipe Description/Summary changes..)
>
>> "Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing)
>
> The write up is done, and outside of the tree.. I just have to post it on the wiki..
>
>> "oprofileUI", "WIP, done by Dec 10 " (Jessica)
>>
>> --M2SC--
>> "Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul)
>> "Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing)
>> "push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03 " (Mark)
>> "Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom)
>>
>> --M2SD--
>> "Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09" (Jessica)
>> "Yocto Installer support for image-creator ", "WIP" (Jessica)
>>
>> --M2SE--
>> "Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing)
>> "Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul)
>> "Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul)
>> "enable KVM with qemu", "on track" (Saul/Edwin)
>> "Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing)
>> "User specified qemu config support", "on track for Dec 9" (Saul/Criping)
>> "SDK Version Control support in SDK generator installer", "on track" (Jessica)
>> "Tracing: Initial SystemTap recipe", "on track" (Tom)
>> "Documentation for swabber", "on track" (Alex)
>> "Defect triage process in public documented and implemented" (Saul)
>>
>> Thanks
>> Kevin
>


-- 
     Sau!

Saul Wold
Yocto Component Wrangler @ Intel
Yocto Project / Poky Build System




More information about the poky mailing list